Installation & Space

Installation day, step by step

Sep 12, 20265 min read
A technician assembling chamber panels on site

Installation day is short when the room is ready. A standard chamber assembly, pressure check and operator briefing takes most of a working day; larger suites add a second day for commissioning.

Before the van arrives

Three things make the difference: a clear route from the loading point, a level floor area equal to the chamber footprint plus one metre on the door side, and access to the dedicated circuit breaker.

After assembly the technician runs a pressure check, records the result, walks the operator through daily checks and leaves a printed maintenance schedule. Nothing is handed over until the chamber holds pressure and the responsible person has been briefed.

OXYHELA

Sealed oxygen chambers and quiet wellness equipment for clinics, hotels and private residences. Transparent specifications, scheduled installation, one direct line.

+853 2323 2323

Contact

  • hello@oxyhela.com
  • Global distribution · Asia-Pacific, Europe, Middle East, North America
  • Response within one business day, Mon–Sat.

Prices shown are indicative starting prices in USD, ex-works, before configuration, freight and installation. Product images are illustrative. This product is not intended to diagnose, treat, cure, or prevent any disease.

© 2026 OXYHELA. All rights reserved.

Designed for quiet recovery