Installation day, step by step

Installation day is short when the room is ready. A standard chamber assembly, pressure check and operator briefing takes most of a working day; larger suites add a second day for commissioning.
Before the van arrives
Three things make the difference: a clear route from the loading point, a level floor area equal to the chamber footprint plus one metre on the door side, and access to the dedicated circuit breaker.
After assembly the technician runs a pressure check, records the result, walks the operator through daily checks and leaves a printed maintenance schedule. Nothing is handed over until the chamber holds pressure and the responsible person has been briefed.